Whole home and structure

Second-Storey Additions in the GTA

Add a full floor without giving up your yard or moving out of the neighbourhood.

New staircase framed in wood before finishingFree quotes

Second-storey additions let you build up and add bedrooms and living space without losing your yard. They need careful structural planning, so we start by understanding what your existing foundation and framing can support.

RenoMake coordinates the engineering input, permits, framing, weatherproofing and interior work, and plans the project so disruption to the rest of the household is as manageable as possible.

Wall framing with plastic sheeting during an open-concept renovation

What’s included

  • Structural review and engineering coordination
  • Permit planning and drawings support
  • Roof removal and temporary weather protection
  • New floor, wall and roof framing
  • Staircase, windows and exterior cladding
  • Insulation, electrical, plumbing and HVAC extensions
  • Interior finishing and final cleanup

How the project unfolds

  1. Assess the structure

    We review the house, foundation and lot and coordinate any engineering and approvals.

  2. Open and frame

    The roof is removed and new floor and wall framing go up quickly under weather protection.

  3. Close in

    The new roof, windows and exterior finishes enclose the addition.

  4. Finish and connect

    Stairs, mechanical systems, drywall and finishes complete the new floor.

Open-plan room prepared with drywall and tile underlay

Options and finishes

  • Full second-storey additions over bungalows
  • Partial additions over garages or rear sections
  • New primary suites with ensuite bathrooms
  • Added bedrooms and home offices
  • Exterior updates to unify old and new

Typical timeline

Second-storey additions are large projects that usually take several months once permits are approved. Weather and engineering reviews affect the schedule.

Questions

Second-Storey Additions FAQs

Can every house support a second storey?

Not always. The foundation and walls need to be reviewed by a professional, and we coordinate that early so you know what is possible.

Do we have to move out?

Often households move out for part of the project because the roof is opened up. We discuss options during planning.

Will my existing floor plan change?

Usually a new staircase is required, so some main-floor changes are likely. We plan this with you.

What approvals are involved?

Building permits and engineering drawings are typical, and zoning limits may apply. We help you understand the process.

Ready when you are

Get your free quote

Call any time, day or night, or send us a few details and we will get back to you.

Call 24/7Free Quote